Liberty Legacy at Fallbrook, Phase 1

Houston, Texas

Faisal supervised Geotechnical Engineering and Construction Materials Testing services for the first phase of this office development consisting of a five-story, 218,250 square foot office building with a 248,400 square foot pre-cast parking garage. The building design consists of a tilt wall concrete shell with 60-foot-tall panels supported by a spread and strip footing foundation. The project included an additional 120,000 square feet of parking and drive areas.

The Geotechnical Engineering report provided recommendations for construction excavations, building pad earthwork, deep and shallow foundations, retaining structures, slab on grade, and rigid and flexible pavements. 

This project received LEED Gold Certification.