Faisal was the geotechnical engineer for this 600,000 SF rail-served tilt wall warehouse facility located near Beltway 8 and Highway 225 – Port of Houston.
The geotechnical investigation included extensive swell testing on the highly expansive subgrade soils. The Geotechnical Report provided engineering recommendations for preparation of the building pad, drilled pier foundations, pavement and rail spur subgrade stabilization, and paving area concrete.