Search
Close this search box.

Boulevard Oaks Business Park Phase 2

Houston, Texas

Phase 2 included six tilt wall buildings totaling 1,148,000 SF. Faisal Samoo was the geotechnical engineer for this phase of the Hines Boulevard Oaks Business Park, a 181-acre plot located in south Houston.

The geotechnical report provided engineering recommendations for preparation of the building pads, drilled pier foundations, public / private pavement subgrade stabilization and light- and heavy-duty site paving. Follow up analysis was performed and recommendations were provided for private roadway pavement sections to support planned tenant traffic loading.